Melaleuca Boulevard Sidewalk Phase 1 & 2 Projects

2013-2014
Milestone Construction Group was the Prime Consultant hired by the City as the CEI.  This project included the construction of approximately 1.3 miles of concrete sidewalk, concrete driveways, drainage pipe, swale liner, utility adjustments, signage, and thermoplastic striping.  The total cost of this project was $371,940.42.  All FDOT Standards, FDOT Specifications, and ADA Requirements were used with the construction of the entire project.  This project was a LAP funded project which required compliance oversight.  Milestone prepared all required documentation for the City to be reimbursed from the FDOT.  Milestone conducted EEO inspections, interviews, payroll verifications, and Davis-Bacon verification.  This project complied with all ADA and FDOT Standards and Specification regarding sidewalk, turnouts, curb ramps, and FDOT Index 600 for Maintenance of Traffic.


               

                                                                              

Indian River Estates Stormwater Project                                                            
2012-2014

This project consisted of the installation of 9 miles of drainage pipe throughout the Indian River Estates development in South Fort Pierce. The work included numerous water main deflections and adjustments, fire hydrant replacements and adjustments, and installation concrete and asphalt driveways. The cost of this project was $6,553,000.

 

Milestone Construction Group was subcontracted on this project to manage the construction, oversee all coordination with utilities and government agencies, develop the plan for coordinating with residents regarding drainage and utility work, and certify that the construction met all the requirements of the Contract Documents.
                                  
This project included the installation of 2.5 miles of drainage and sidewalk on both sides of Weatherbee Road from US-1 to Silver Oak Drive, Midway Road from Silver Oak Drive to Buchannan Drive, and drainage and sidewalk on Buchannan Drive and Silver Oak Drive. The project also included over 57 driveways with mitered end sections, asphalt turnouts, water main adjustments, valve adjustments, fire hydrant relocations and adjustments, concrete gravity wall, modified “D” curb, type F curb and gutter, and graded swales. Additionally, the design and construction was done in compliance with ADA and FDOT specifications regarding sidewalks, cross-slopes, tie-ins, and ADA ramps. The total cost of this project was $1,515,592.

            
 




This project included the construction of drainage, driveways, and roadway in the Harmony Heights subdivision in North Fort Pierce. The project provided drainage and roadway reconstruction on 41st, 42nd, and 43rd Streets from Grady Road to Juanita Avenue; including San Diego Avenue. The project included numerous driveways with mitered end sections and graded swales, water main adjustments, valve adjustments, and fire hydrant relocates. The design and construction was done in compliance with ADA and FDOT specifications regarding sidewalks, cross-slope, tie-ins, and ADA ramps. Our personnel maintained constant communication with residents regarding construction schedules to minimize impacts as the work crossed their driveway locations. Lastly, this project included MOT set-ups and reviews in accordance with the FDOT 600 Indexes; which our personnel are trained and certified to inspect. The total cost of this project was $1,069,250.

            


            




Milestone Construction Group was the Prime Consultant to provide CEI Service for the construction of the project and certify all construction activities. This project included the construction of a new 1,100 foot two land road that connected Crosstown Parkway to Salvatierra Blvd. The project included connecting to and adjusting an existing drainage system, construction of F-type curb and gutter, and grading. The total cost of this project was $255,600.  

             




St. James Sidewalk Project
2011

Milestone Construction Group was the Prime Consultant to provide CEI Services, hired by Saint Lucie County. This project included the construction of Side walk on the East side of St. James Drive from the Oxbow Eco Center to Rivers Edge Elementary School. This project also included a sidewalk and headwall extension.

              

              


Discovery Way East and West
2011

Milestone Construction Group was the Prime Consultant hired by the City as the CEI. This project included the construction of a two (2) lane divided roadway with irrigation, utilities, lighting, concrete curb and gutter, drainage. The total cost of this project was $250,000. All FDOT Standards and Specification were used with the construction of the entire project. Milestone coordinated with multiple contractors and utilities to keep the project moving and completed on time. This project complied with all ADA and FDOT Standards and Specification regarding curb and gutter, sidewalk, turnouts, curb ramps, and FDOT Index 600 for Maintenance of Traffic.

              




This project included the construction and replacement of a 16” Water Main at the NE quadrant of US-1 and Port St. Lucie Blvd. (Cane Slough Road). The work included the construction of a new main, tie-in, removal of an existing main, curb, sidewalk, and grading of the swale. The total cost of this project was under $100,000.

 

This project was very MOT sensitive (being in the intersection of US-1 and Port St. Lucie Blvd.) and coordination with multiple utilities was necessary to complete the project within the Contract time frame. Milestone ensured that the work was constructed with the City of Port St. Luce’s Utility Systems Department’s Standards and Specifications and other contract documents; including all testing, certification and acceptance. Additionally, this project complied with all ADA and FDOT Standards and Specifications regarding curb and gutter, sidewalk, turnouts, roadway, curb ramps, and the 600 Indexes regarding Maintenance of Traffic.

              




This project included the construction of a four lane divided roadway with landscaped median, pedestrian lighting, concrete sidewalk, drainage, drainage ponds, subgrade, base, asphalt, water main and sewer main deflections, and signalization. The total cost of this project was $2,924,000. Becker Road – Segment 4 construction included multiple MOT setups, re-routing of traffic through the work zone, drainage, concrete, turnouts, and black base (B-12.5) construction. This project also complied with all ADA and FDOT Standards and Specifications regarding curb and gutter, sidewalk, turnouts, curb ramps, and Maintenance of Traffic.

                             
  

 



Milestone Construction Group was hired as a sub consultant to manage the construction of the project and certify all construction activities. This project included the construction of a new four lane divided bridge over Florida’s Turnpike, an electronic interchange, widening of an existing low level bridge, landscaped median, pedestrian lighting, concrete sidewalk, drainage, drainage ponds, subgrade, base asphalt, water main, lighting and signals. The total cost of this project was $22,000,000. This project was constructed with multiple MOT plans, multiple phases of construction, multiple underground activities requiring coordination between multiple contractors and governmental agencies, and adjusting of signals during the construction process. This project complied with all ADA and FDOT Standards and Specification regarding curb and gutter, sidewalk, turnouts, curb ramps, and FDOT Index 600 for Maintenance of Traffic.

              


              




Milestone Construction Group was hired as a sub consultant to manage all the construction of the project and certify all construction activities. This project included the construction of two (2) miles of six lane divided roadway with landscaped berms, ponds, utilities, landscaping, lighting, irrigation, and multiple prime contractors. The total cost of this project was $14,000,000.

All FDOT Standards and Specification were used with the construction of the entire project. Milestone coordinated with multiple contractors and utilities to keep the project moving and completed on time. This project complied with all ADA and FDOT Standards and Specification regarding curb and gutter, sidewalk, turnouts, curb ramps, and FDOT Index 600 for Maintenance of Traffic.

              




Milestone Construction Group was hired as a sub consultant to manage all the construction of the project and certify all construction activities. This project included the construction of two (2) miles of six lane divided roadway with landscaped berms, ponds, utilities, landscaping, lighting, irrigation, and multiple prime contractors. The total cost of this project was $16,000,000.

All FDOT Standards and Specification were used with the construction of the entire project. Milestone coordinated with multiple contractors and utilities to keep the project moving and completed on time.This project complied with all ADA and FDOT Standards and Specification regarding curb and gutter, sidewalk, turnouts, curb ramps, and FDOT Index 600 for Maintenance of Traffic.